Highway Bridge in Guangdong Province
| Project Company | First Engineering Company |
| Problem | The company encountered unexpected underground conditions which required the caisson diameter to be increased from 10.33' to 11.8'. With the larger size the original 150KW (200 HP) would no longer be able to do the job. As a result the project was delayed. |
| Solution | FACE, I.C.E.'s subsidiary company in Hong Kong, brought in a 44-50 with an 11' caisson beam. The first series of caissons were 10.33' (3.15m) in diameter and 98' (30m) in length. The second series was 11.8' (3.6m) in diameter at ther same length. The contractor fabricated a special bracket on top of the caissons to fit the 11' beam. |
| Results | The 44-50 drove the caissons without much problem |
| What the Client Says | "When we decided to purchase this machine, we had no clue whether this hammer could do the job or not, but I.C.E. had proved to us that your machine is the fastest and most economical method, and we are proud that we are the first I.C.E. vibro hammer client in China." Liu Wenhua Deputy GM |