Installing Additional Foundation Piles
| Problem | This earthquake retrofit job involved installing additional foundation piles under an existing elevated roadway. |
| Solution | I.C.E. built a special leads and boompoint attachment. the leads were used with a Vulcan Hammer and and I.C.E. 200S diesel. An I.C.E. Model 175 spotter was also used. |





