| Project Company: |
Odebrecht-Metric |
| Problem: |
The Santa Rosa Bay Bridge near Pensacola Florida required driving heavy concrete piles - 36", 145'long. The project required a hammer that was specifically designed to minimize driving stresses in heavier concrete piles. |
| Solution: |
The 120S-16 has a 16,000 lb (7,250kg) ram and a rated continuous energy of 128,00 ft-lbs (269.4 kNm) The hammer was designed specifically to minimize driving stresses in heavier concrete piles. The 120S-16 can also run in the Eco-Hammer mode with 100% non-petroleum fuel and lubricants for environmentally-sensitive job sites |
| Result: |
another successful project using I.C.E. hammer drives |
| What the Client Says |
"The response from I.C.E. is really amazing. They come (he snapped his fingers). In 10 minutes they are calling you. They are trying to do everything. As far as service, I believe you guys are doing a great job." |