| Project Company: |
Gimrock Construction |
| Problem: |
A layer of lime rock approximately 10 feet below the bay bottom. The project involved driving 81' long, 20 inch, concrete piles with 5' stingers to penetrate the lime rock strata. |
| Solution: |
The I.C.E. Model 160. Soil conditions in Tampa are almost always difficult but the Model 160 did a good job |
| Result: |
Despite the difficult conditions, the Model 160 performed well . |
| What the Client Says |
"The 160 did a good job. We'll be using it again on an upcoming $13 million project at the Port of Miami to drive approximately 500 piles. |