Transmission Tower Project
| Problem | The job involved installing transmission towers in soft soil and widely spaced foundation locations which made road access impractical |
| Solution | The solution was to use a Skycrane helicopter to handle both the I.C.E. 416L vibrator and the transmission towers. |





