ICE® 14C Helps First Responders

Rappahannock River Views Available to Pedestrians 

Editor: Ashley Steele 

The Chatham Bridge in Fredericksburg, VA is getting a make-over. The reconstructed bridge will receive a 10-foot-wide pedestrian path, new railings, light fixtures, and a new scenic overlook for viewing the Rappahannock River. The new structure will also enable for 15-ton weight limits enabling emergency vehicles to use the bridge without a forced detour for a faster and safer response.  
At an estimated cost of $23.4 million dollars, but with the added benefit to save lives, the state of Virginia is utilizing funds from the VA Good Repair Program which is part of the state funded transportation budget. This life saving bridge upgrade was awarded to the infamous Joseph B. Fay Company. This contractor is out of Pittsburgh, PA and utterly understands how bridge repair must happen to sustain lives and improve to market supply chains.  
The versatile ICE® 14C Vibratory Pile Driver/Extractor is used on a regular basis to build foundations in tight spots, like under existing structures and bridges.  This unit is unique as it does not have to be disassembled to fit. It can be mounted directly to an excavator or hung from a crane and works well in both applications. J.B. Fay Company decided to attach the ICE® 14C to an excavator, allowing the customer to effectively drive the sheet piles while working in confined spaces under the existing structure. J.B. Fay Company team was thrilled with the ICE® 14C install that they are preparing to use the same setup to pull these temporary sheet piles. 
Our ICE® Team is thrilled that this J.B. Fay Company project will bring new life to the 79-year-old Chatham Bridge, which hosts over 16,000 vehicles a day. Building bridges and connecting people with ideas, nature and each other is at the core of everything ICE® loves to be involved with and this job is no different. Hats off to an innovative customer. 
Media Contact-  
Pollyanna Cunningham, MA, MBA  
Director Marketing, Brand and Media Relations  
ICE® - International Construction Equipment, Inc  
Office - 704-821-8200  
Email - marketing@iceusa.com  

 

Posted in Vibratory Pile Hammers. Tagged as 14C Vibratory Driver/Extractor, Building Bridges, Foundation Equipment, ICEUSA, Pile Driving.

Reimagining New Orleans Ferry Terminal

50B works to enable changes on Canal Street  

Since the first regular scheduled ferry service from Algiers to Canal Street in 1827, New Orleans has provided dependable passage across the Mississippi River. The Canal Street Ferry Terminal has seen many years of evolution in transportation, including in 1952, the construction of the Greater New Orleans Bridge. Today, the New Orleans Ferry system is one of the highest ridership of any ferry system in the U.S.A. The state transportation boards are continually improving and maintaining the Canal Street Terminal to keep traffic flowing in an orderly and successful fashion. If the riders become disenchanted, the alternative sources of transportation are not scaled to handle the influx as it stands today and this could be catastrophic to the entire NOLA transportation eco-system. 
With decades of experience delivering beyond the industry standard and beyond their clients' expectations, APC Construction Company is responsible for the historic Canal Street Ferry Terminal three phase project. After demolition of the old terminal during phase one, APC Construction Company choose the industry's stacked rockstar, the ICE® 50B Vibratory Driver / Extractor paired with the ICE® tier four (environmentally friendly) 580T Power Unit.  
The new terminal is so enormous that the team is driving caissons for a temporary dock being used during construction of the new terminal. The initial plan was to start the job with the ICE® 50B and send in a vibratory driver twice the size, the ICE® 110 Vibratory Driver / Extractor to finish driving the piles. What the customer learned is the ICE® 50B is an absolute fabulous partner that is powerful enough to drive 16" and 42" caissons to grade efficiently on its own.  
This two-year $43 million project that is set to finish in summer of 2022, will replace the old terminal with a sleek and modern, ADA compliant terminal and bridge. The updated terminal will be greeting guests as it also serves as the conduit to the beautiful riverfront connecting the Spanish Plaza and the Audubon Aquarium. This exceptional ferry system is no longer needed for vehicle transportation, so the design team has refocused the new terminal for passenger experience with a focus on accessibility and outside public transportation services.  
The finished Canal Street Ferry Terminal will be a progressive update to the New Orleans historic districts. Congratulations to APC Construction Company on making this revitalization happen. What an amazing project! 
 
Media Contact- 
Pollyanna Cunningham, MA, MBA 
Director Marketing, Brand and Media Relations 
ICE® - International Construction Equipment, Inc 
Office - 704-821-8200 
Email - marketing@iceusa.com 

 

Posted in Vibratory Pile Hammers. Tagged as Environmental Impacts, Foundation Equipment, ICE 50B Vibratory Driver/Extractor, ICEUSA, MunicipalityInstall, Pile Driving.

Archives