The I-5 Segment 7 Batiquitos Lagoon Double Track project in Encinitas, California, stands as a critical infrastructure upgrade designed to end a major transit bottleneck by replacing an aging single track wooden railroad trestle with a modern double track concrete rail bridge. The construction required balancing extreme structural demands with delicate environmental stewardship, because the site is located directly over a highly protected marine lagoon that serves as a vital habitat for protected regional wildlife. Maintaining transit continuity added immense complexity to the project since regional passenger and freight trains had to continue running safely over the existing 1940s wooden trestle, directly next to active heavy construction. Budgeted in the $3 - $10 million range, the complex build operated within tight daily work windows and seasonal mating restrictions to avoid disrupting local nesting species.
Forefront Deep Foundations, Inc. earned the responsibility for installing the driven pipe piles supporting the new transit structure for the California Department of Transportation. Known for executing technically demanding marine foundation installations, the specialty contractor brought the exact tactical expertise needed to manage tight tolerances under strict railroad permits. Their crew members completed comprehensive site-specific railroad safety training and maintained continuous monitoring protocols on the active track to ensure that any ground movement exceeding 1/4" (in) would instantly halt operations for evaluation. By developing a specialized installation procedure centered around a custom fabricated pile template the engineering team proved why they were uniquely qualified to handle unstable lagoon embankments and highly variable subsurface conditions.
To meet the rigid engineering requirements without endangering the adjacent wooden railroad bridge, the contractor chose an ICE® I-80 Diesel Impact Hammer deployed from a Terex HC 210 crane in 37" (in) swinging leads. Project engineers on this specific job site were concerned about causing any damage to the active, aging timber trestle, so the team elected to utilize the precise high energy blows of the ICE® impact system. This heavy impact hammer features a powerful 17,640 lb. ram weight and delivers a massive, rated energy of 208,300 ft-lbs., at fuel setting 4, with a maximum geometric stroke of 15' (ft). Working from a temporary trestle spanning the water the crew utilized the impact system to drive thirty 30" (in) by 1" (in) cast in steel shell pipe piles ranging from 133' (ft) to 141' (ft) in length alongside ten 36" (in) by 1" (in) pipe piles between 78' (ft) and 83' (ft) long. The specialized driving technique allowed the team to safely guide the initial sections through the custom template before splicing on the secondary pile extensions and driving them down until they successfully achieved practical refusal by penetrating 2' (ft) deep into the dense underlying Santiago Formation. More detailed operational insights regarding this award-winning installation are available through the official PDCA 2025 Project Winner feature.
Southern California commuters and transit authorities owe an immense debt of gratitude to Forefront Deep Foundations, Inc. for securing the regional rail corridor while protecting the delicate coastline ecosystem. International Construction Equipment, Inc. (ICE®) proudly congratulates Forefront on winning the prestigious PDCA Project of the Year Award and extends its highest praise to the project crew for choosing the ICE® foundation line to help solve these complex structural challenges. The successful completion of this double track segment showcases how elite engineering expertise combined with heavy impact machinery can build tomorrow's infrastructure while fully respecting the natural environment.
Learn more about the ICE® I-80
Need Hydraulic Hose Fast? We've Got You Covered.
Whether you're running a crane, excavator, or keeping your shop truck in top shape, downtime isn't an option--and neither is settling for second-rate parts. At HydraulicHose.com, we stock the exact hose kits, bundles, fittings, and adapters your equipment demands.
From high-pressure lines to custom assemblies, we carry the hose they use--built to perform, built to last.
Shop now and keep your machines moving.
Media Contact-
Pollyanna Cunningham, MA, MBA
Vice President
ICE® - International Construction Equipment, Inc
The Hose Company
Office - 704-821-8200
Email - marketing@iceusa.com / info@hydraulichose.com