Bauer Construction Ensures Engineering Excellence
February 19, 2025In 2022, developers Third Lake Capital and Echelon unveiled plans for "3rd & 3rd," a high-rise residential complex set to transform the skyline of St. Petersburg, Florida. This ambitious project, located at 235 3rd Street South, will feature a 33-story tower, making it one of the tallest buildings in the city and is scheduled to be completed by early 2026.
The 0.88-acre build site, previously occupied by a low-rise building and parking lot, will soon host 268 luxurious apartments. These residences will range from modest studios to expansive two-story penthouses, all boasting floor-to-ceiling windows and high-end finishes. Residents will enjoy angular balconies measuring 12 to 14 feet, along with access to a host of amenities, including an eighth-story pool deck, fitness center, community kitchen, work-from-home spaces, and fire pits.
In addition to its residential offerings, 3rd & 3rd will feature over 15,000 square feet of ground-floor retail space and more than 320 parking spots. The project required the demolition of a three-story building to make way for this new development.
Bauer Construction was appointed as the General Contractor for the foundation work of this landmark project. Known for their expertise in foundation and geotechnical work, Bauer Construction ensured that the 375-foot-tall tower stands on a solid foundation. At the end of 2024 the foundation work was successfully completed, marking a significant milestone in the construction of 3rd & 3rd.
To tackle the challenging foundation work in such a confined urban space, Bauer Construction utilized a rented ICE® 110 Vibratory Hammer from International Construction Equipment, Inc (ICE®) to drive the massive steel caissons essential for providing the necessary support and stability for such a tall structure. The ICE® 110 is renowned for its high driving force and efficiency, making it ideal for projects with limited space and surrounding buildings. Paired with Hydrauli-Flex hoses to help maintain the efficiency and effectiveness of ICE® vibratory hammers, even in demanding applications, this equipment allowed Bauer to perform precise pile driving operations, ensuring minimal disruption to the neighboring structures while maintaining the integrity of the foundation.
The 3rd & 3rd project is a significant milestone for Downtown St. Pete, contributing to the city's evolving skyline and providing much-needed residential and commercial space. The use of advanced equipment like the ICE® 110 Vibratory Hammer underscores Bauer Construction's commitment to delivering high-quality results in even the most challenging environments.
Congratulations to the entire Bauer Construction team for their pivotal role in this transformative project! International Construction Equipment, Inc. (ICE®) is proud to partner with contractors like Bauer, whose dedication to excellence and innovation drives the success of such impactful developments.
Learn more about the ICE® 110 Vibratory Hammer
Media Contact-
Pollyanna Cunningham, MA, MBA
Vice President Marketing, Brand and Media Relations
Vice President IT and IT Comm
ICE® - International Construction Equipment, Inc
Office - 704-821-8200 Email - marketing@iceusa.com