Drilling into Progress

Comacchio_MRenninger_DanvillePA2

In Danville, PA, the Geisinger Medical Center is undergoing a major expansion to meet the growing healthcare needs of the region. Located along the Susquehanna River, Geisinger has long been a cornerstone of central Pennsylvania's medical infrastructure. This latest development includes an 11-story tower, a new emergency department, private patient rooms, and a multi-level parking garage; all part of an $880 million modernization effort aimed at improving patient care and expanding capacity. 

The foundation work for this project is no small feat. Contractors Whiting-Turner, Coastal, Brayman, and Nicholson Construction are all on-site, collaborating to install a combi-wall King Pile system; a critical structural element designed to stabilize the ground and support the new build. The combi-wall system is especially suited for challenging soil conditions and deep foundation requirements, making it ideal for this high-profile hospital expansion. 

To execute the most recent portion of work, these expert teams are currently utilizing a range of Comacchio Drill Rigs rented from their local International Construction Equipment (ICE®) Sales Representative. Known for their precision and reliability in geotechnical applications, these multi-functional rigs are paired with durable Hydrauli-Flex™ hose assemblies, which play a key role in keeping the equipment running smoothly, especially under the demanding conditions of continuous operation. 

Interestingly, recent excavation efforts have revealed remnants of the hospital's original 1914 construction, including old columns and signage, adding a layer of historical significance to the job. A tower crane is expected to be installed soon, marking the next phase of vertical construction. 

The long-standing relationships between these contractors and trusted suppliers like ICE® have helped streamline operations, uphold rigorous safety standards, and ensure efficiency across the board.  This collaboration stands as a strong example of what's possible when expertise and partnership come together. International Construction Equipment (ICE®) is proud to continue delivering reliable, high-performance equipment that our clients have come to depend on. 

As the new tower begins to rise, the Danville community can look forward to a stronger foundation, both in steel and in service, for the future of healthcare. Bravo to everyone involved!  

Learn more about our line of Comacchio Drill Rigs

Need Hydraulic Hose Fast? We've Got You Covered. 

Whether you're running a crane, excavator, or keeping your shop truck in top shape, downtime isn't an option--and neither is settling for second-rate parts. At HydraulicHose.com, we stock the exact hose kits, bundles, fittings, and adapters your equipment demands. 

From high-pressure lines to custom assemblies, we carry the hose they use--built to perform, built to last. 

Shop now and keep your machines moving. 

Media Contact-         
 Pollyanna Cunningham, MA, MBA         
 Vice President   
 ICE® - International Construction Equipment, Inc      
 The Hose Company     
 Office - 704-821-8200         

Posted in Comacchio Drill Rigs, ICE Team. Tagged as Comacchio, Combi Wall, Commercial Build, ICE Drilling, ICEUSA.

Post a comment (* required field)

Name *
Email * (will not be published)
Website
Comments *

Archives