NEW ICE® 70 is Revitalizing Brooklyn’s Working Waterfront

Playing a vital role in New York City's maritime economy, the Brooklyn Marine Terminal is revitalizing its operations to reaffirm its position as a cornerstone and key hub for cargo movement, vessel docking, and waterfront operations. As part of ongoing improvements to ensure safe vessel clearance and long‑term structural stability, crews returned this season to advance previously installed sheet piles with an additional 5' to 8' (Ft) to ensure their ability to clear the docking vessels. With pi ... Read more

Baker Builds a Legacy

At the Naval Air Station Joint Reserve Base New Orleans, a new landmark is taking shape--an airplane display stand that will serve as a striking centerpiece at the facility's entrance. This project is more than just a structural addition; it's a symbol of aviation excellence and military heritage, welcoming personnel and visitors alike to one of the region's most vital defense installations. To ensure the stability and longevity of the display stand, local contractor Baker Pile Driving was ... Read more

Reagan Marine Enhances Military Infrastructure

A significant transformation is underway onboard a military installation in Newport, Rhode Island. The bulkhead replacement project is not just about updating the infrastructure; it's about providing a solid foundation for future improvements. The contractor for this project, Reagan Marine Construction (Reagan Marine), brings more than 50 years of experience in marine and waterfront construction. Specializing in pile driving, steel sheeting installation, demolition, and dredging, Reagan Marine ... Read more

Irishtown Bend Project Ensures Growth & Stability

The Irishtown Bend hillside stabilization project near Lake Erie, in the Cleveland, OH area, is a critical infrastructure initiative aimed at preserving the integrity of the Cuyahoga River shipping channel. This nearly $60 million project is essential for preventing the hillside from collapsing into the river, which would have severe economic and environmental consequences. The work includes replacing over 2,100 linear feet of bulkhead and removing fill material that has contributed to slope ins ... Read more

Archives